Powered By Kitlog Pro v2.0
My RV-8 build
RV-8
Fuselage
3-18-2013
< Previous Log Entry
Next Log Entry >
Date:
3-18-2013
Number of Hours:
3.00
Manual Reference:
Page 8-26
Brief Description:
Right lower and auxilliary longeron drilling
Same as the left lower and auxilliary longeron. Didn't go through that many bits this time, but these are tough holes going through the steel.
My care package arrived from Van's today. My Andair valve and the rear seat throttle kit.
Right side lower longeron done
Andair fuel valve
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
452
866
About me
1
1
Avionics
3
4
Canopy
3
6
Electrical
4
6
Empennage
74
120
Engine
6
10
Finishing Kit
2
2
Flying
3
4
Fuselage
147
353
Instruments
2
0
Miscellaneous
14
36
Panel
7
17
Practice Kits
1
1
Tools
6
16
Wings
178
287
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.